Evening micro-grid load shedding

Example highland village · East Africa (synthetic)

Date observed
8 Jan 2026
Last update
2 Jun 2026
Local contact
Village energy committee

Current status

  1. Observed

    Completed

  2. Verified

    Completed

  3. Open

    Completed

  4. Solution Proposed

    Current

  5. Testing

    Not reached

  6. Resolved

    Not reached

  7. Monitored

    Not reached

At least one proposal exists. A proposal is not a verified solution.

WHAT WOULD CHANGE THIS STATUS?

A load-profile measurement across the evening peak, plus an agreed test window with the grid operator, would move this to Testing. Evidence that demand has been mis-measured would send the record back to Observed.

Every record states in advance what evidence would move it. A status is a current reading of the evidence, not a verdict.

Local context

OBSERVATION

A community-owned solar micro-grid cannot cover evening cooking and lighting load. Households ration usage informally.

Who is affected: Roughly 90 connected households (synthetic).

Evidence

Evidence summary: Synthetic inverter logs; unreviewed.

Evidence here does not mean absolute truth. It means: a record exists, with a source, a date and a provenance, and it has reached the review stage shown below.

EVIDENCEConfidence: ModerateUnder review

Three months of synthetic inverter load and state-of-charge logs.

Source
Micro-grid operator export (synthetic)
Evidence submitted
30 Apr 2026
Provenance
Machine-generated export, no independent calibration record.
Evidence reviewed
Not reviewed

What is needed

  • Storage sizing review
  • Demand-shifting design
  • Tariff design help
  • Capital pathway

Proposed solutions

PROPOSALProposedProposed 2 Jun 2026

Scheduled demand shifting before storage expansion

What is proposed
Test coordinated appliance scheduling before spending on additional batteries.
Why it might work
Peak is narrow; shifting part of it may remove the deficit at far lower cost.
Experience / expertise
Off-grid systems engineer (synthetic contributor)
Supporting references
Operator logs only.
What needs testing
Eight-week scheduling trial with volunteer households.
Risks / limitations
Behavioural compliance; fairness concerns if scheduling is uneven.

Tests

No test started.

Updates

  1. OBSERVATION· Local contributor

    Evening shortfall reported by the energy committee.

  2. PROPOSAL· Remote contributor

    Demand-shifting trial proposed ahead of any hardware purchase.

Outcome

No outcome recorded yet. This is the current evidence-backed state of the issue, not a final conclusion.

Offer a solution

A proposed solution is not a verified solution. It enters as Solution Proposed and only testing can move it forward. Local people decide what is workable in their context.

State the assumption your proposal depends on.

If nothing could disprove it, it cannot be tested.